Poster: Emission testing in line with MIL-STD-461

Ensuring strict compliance of electronic equipment and subsystems, with standards for electromagnetic interference (EMI) emissions, is of critical importance for military, space, and aviation systems.

The measurement times according to the standard for RF emission tests with traditional EMI test receivers can be very long, as a minimum dwell time per frequency step must be maintained in order to reliably detect intermittent signals. Modern EMI test receivers with FFT time-domain scan offer the advantage of significantly shorter measurement times because entire frequency ranges are measured at once.

Our exclusive poster is the perfect way to get an overview of the MIL-STD-461 and learn about the advantages of the FFT method.

Explore the:

  • RF emission requirements
  • Test setups for RE102
  • EMI test solutions for aerospace and defense applications

Hang it in your lab or personal workspace and get all the insights you need at a glance!