9 Results
During a CMWrun test my DUT fails on delivering isolated measurements using CMW270/290/500.
My SW needs to validate its usage by means of a license available in a Dongle for testing with CMW 270/290/500, which are the requirements?
If a CMWrun test plan script has been fished the AC power of a CMW500 / CMW290 / CMW270 should be shut down automaticly.
How can the external attenuation values be configured and embedded in the CMWRun test sequences?
CMWrun : Needed preparations to use an Android UE with the phone control function.
How can I read in a text file from a realative path during a run of a CMWrun script?
CMWrun Settings for external Interfer usage in Bluetooth LE Test Plans.
When starting MOS audio quality measurments with CMWRun connected to a CMW communication tester and an UPV audio analyzer, a failure message occurs that the calibration files "mobile_in.ccl" and "mobile_out.ccl" can not be found.
How can different test-plans be combined to a sigle test plan that will be executed one after another? Can I combine also the results into one report?