12 Results
R&S®Server-Based Testing helps reduce test times for 5G New Radio multicarrier signals - each component carrier can be analyzed independently and in parallel.
13-Sep-2021
It is extremely important to test the application level functional performance of home automation products in the presence of interference.
11-May-2020
The ARB Toolbox is an easy-to-use, feature packed software package that is used for many ARB waveform related tasks.
13-Dec-2018 | AN-No. 1GP88
Software tool for fast and repeatable optimization of signal analyzer RF front-end settings
The signal conditioning in the RF front-end of signal analyzers is crucial to achieve the best performance with respect to image-suppression, noise-floor, dynamic range and other RF-key parameters.Precise signal levelling is especially important for complex measurements like Error-Vector-Magnitude (EVM). To minimize the measurement uncertainty from test system contributions over a wide range of different levels, the RF front-end needs to be adapted continuously according to the signal characteristics, signal power and frequency - ideally using an automatic levelling algorithm.This document describes the approach of a waveform specific, on-site characterization of the signal analyzer: For each waveform and frequency of interest, the instrument is evaluated in a first step. With this additional data, a fast and repeatable auto-levelling can be performed during the actual measurement.
24-Jan-2022 | AN-No. 1EF111
Verify the energy efficiency of your O-RAN radio units
19-Mar-2024
conducted conformance testing according to TS 38.141-1, Rel. 15
This application note describes how all mandatory RF receiver tests can be performed quickly and conveniently with signal generators from Rohde & Schwarz.
02-Dec-2020 | AN-No. GFM314
conducted conformance testing according to TS 38.141-1, Rel. 16
This application note describes how all mandatory RF transmitter tests according to Release 16, can be performed with signal or spectrum analyzers from Rohde & Schwarz.
27-Jan-2021 | AN-No. GFM313
This application note explains how to convert different Rohde&Schwarz I/Q file formats among each other using the supplied software tool.
23-Sep-2015 | AN-No. 1EF85
radiated conformance testing according to TS 38.141-2, Rel. 16
3GPP defines the Radio Frequency (RF) conformance test methods and requirements for 5G NR Base Stations (BS) in the technical specifications TS 38.141.
30-Jun-2020 | AN-No. GFM325
This Application Note gives a short overview how signals with two different modulation schemes can be analyzed using the R&S®FSW.
18-Apr-2016 | AN-No. 1EF93
The document gives an overview and user guide about a link budget calculator for the main components of a basic OTA system. Accomopanied by an Excel sheet containing the Link Budget Calculator.
19-Mar-2019 | AN-No. 1EF104